HDT & HCK
CCR
CDU
Solvent Deasphalting
Aromatics
PDH
BDH
PP
EO/EG
Olefins Catalytic Cracking
Rectisol
Methanizer
Process Gas Heater
Overhead Condenser
Low-grade Heat Recovery

42 references
31 in operation
Total installed capacity >135 MMTA
>43,000 days of cumulative operation
13 years of operation in Isomerization
High efficiency allowing hot approach temperature of less than 30°C
High resistance to pressure and temperature fluctuations
Long-term stable operation
Easily mechanically and chemically cleanable.

105 references
88 in operation
Total installed capacity >125 MMTA
>150,000 days of cumulative operation
15 years of operation in CCR
High efficiency allowing hot approach temperature of less than 30°C
High resistance to pressure and temperature fluctuations
Long-term stable operation
Easily mechanically and chemically cleanable.

224 references
172 in operation
Total installed capacity >175 MMTA
>315,000 days of cumulative operation
17 years of operation in hydrotreatment
High efficiency allowing hot approach temperature of less than 10°C
large heat transfer area reducing plot area
High resistance to pressure and temperature fluctuations
Long-term stable operation
Easily mechanically and chemically cleanable.

48 references
29 in operation
Total installed capacity >11 MMTA
>22,000 days of cumulative operation
7 years of operation in PDH unit
High efficiency allowing hot approach temperature of less than 25°C
High resistance to pressure and temperature fluctuations
Long-term stable operation
Easily mechanically and chemically cleanable.